KeHE deduction recovery for suppliers.
Recover KeHE MCBs, UDR shortages & prefix deductions in KeHE CONNECT (K-Solve). 180-day window (48-hr UDR). 100% contingency. Free 72-hr audit!

Overview.
KeHE Distributors generates heavy deduction volume due to its multi-layered administrative fee and pass-through architecture. Beyond holding initial PO payments for 6 months until opening inventory sells through (and charging $50 database setup + $50/warehouse + $40 imaging + a minimum 15% introductory allowance), KeHE deducts a flat 2% Connect BI analytics fee (MA) on all sales, an 8% Extra Performance (EP) fee (up to $500/invoice) on scan/ad/demo/slotting promotions, and an 8% processing fee on all Manufacturer Chargebacks (MCBs) with a $65 per-DC bi-weekly minimum. On the receiving dock, KeHE relies on its Unloading Discrepancy Report (UDR) for shortages, overages, damages, and date-code issues—giving suppliers a **48-hour window** from notification to respond with a BOL and packing slip.Inside K-Solve (one ledger per supplier ESN), deductions post *before* the remittance check is cut and are encoded by 1-to-4-letter invoice prefixes.
Operational and audit prefixes include IA (Invoice Adjustment), C (Case Cuts), E (Fine), SLF (Service Level Fine—quarterly fines for \<92% On-Time performance), G (Damages/Spoils—plus $0.29/unit unsaleable fee), Q (Out of Date), QM/QT (Warehouse Salvage), KC (KeHE Audit Short/Price), KP (Short on Deal), MGP (OI Audit Movement Greater Than Purchase), and RR (Retailer Audits—2-year post-audit window with 30 days' notice under Clause 4.9). Retailer pass-through prefixes (ALB, AA, AM, SA, SC, SF, SN, GP, HB, ME, WG) carry a critical catch under Clause 4.4: when an error originates from a retailer's deduction, KeHE repays the supplier *only* after the retailer repays KeHE.
Suppliers dispute KeHE deductions by logging into KeHE CONNECT, opening the K-Solve module, clicking the red or blue dispute icon to file a "Request for Repayment" within 180 days of the deduction, and answering any Unloading Discrepancy Report (UDR) within 48 hours.
* Destination-signed Proof of Delivery (POD) with zero exceptions and proof of 48-hour UDR rebuttal. Clean Bill of Lading (BOL) and Packing Slip showing shipped case counts. Matching Purchase Order (EDI 850), Invoice (EDI 810), and timestamped ASN (EDI 856).
Standard K-Solve tickets typically resolve in ~21 days (3 weeks), though KeHE's policy allows up to 180 days for a response and requires retailer repayment first on pass-through deductions (Clause 4.4). DhaReclaim tracks every K-Solve ticket until prefix RP (Repayment) posts.
Common KeHE deductions.
Unloading Discrepancy Reports / UDRs, IA Invoice Adjustments, C Case Cuts, KC KeHE Audit Product Short
MCBs with 8% fee / $65 DC min, KP Short on Deal, MGP Movement Greater Than Purchase, RR/ALB/MX Post-Audits, PO Opportunity pricing mismatches
SLF Service Level Fines for \<92% On-Time performance, E Fines, FF Freight, 8% Extra Performance fees, 2% MA Connect BI fees
G Damages/Spoils at landed cost + $0.29/unit fee, CS Customer Spoilage, Q Out of Date, QM/QT Warehouse Salvage, MK Markdown Credits, V/VR/RM Vendor Returns
How KeHE disputes work with us.
Monitor your supplier ESN ledger in K-Solve (inside KeHE CONNECT) daily—catching deductions as they post prior to check issuance—and decode every invoice prefix (IA, KC, MGP, G, SLF, etc.).
Answer every Unloading Discrepancy Report (UDR) within 48 hours (Clause 6.6) by matching the PO, BOL, and packing slip, and email pre-shipment PO pricing/pack errors to vendorsupport@kehe.com with subject "PO Opportunity".
Assemble destination-signed Proof of Delivery (POD) proving no UDR covered the PO, timestamped EDI 856/810 logs, and signed promo agreements (for both KeHE and the end retailer on Clause 4.4 pass-throughs).
File formal "Requests for Repayment" in K-Solve using the red or blue dispute icon within the 180-day Clause 4.4 window (and route compliance disputes to vendorperfromance@kehe.com), attaching all backup upfront.
Follow up with the K-Solve ticket number after 21 days and track approved recoveries under prefix RP (Repayment) on subsequent remittances.
Why DhaReclaim.
Our cost base lets us pursue the small, high-volume claims others write off. That's where most of the money is.
Our operations team in India works while US suppliers sleep, so disputes go out faster and deadlines aren't missed.
You pay 30% of what we recover, invoiced after the retailer pays. No setup fee, no minimum, month to month.
A free 72-hour audit shows what's recoverable before you sign anything.
We collect the PODs, BOLs and invoices, file the disputes and follow up. Nothing new for your team to learn.
Read-only access, revocable at any time, under NDA. A named point of contact and regular reports on every dollar.
